LDC (Portfolio One) Ltd v George Downing Construction Ltd and European Sheeting Ltd [2022] EWHC 3356 (TCC)

In July 2022, we had the outcome of the first cladding case post the Grenfell Tower tragedy (Martlet Homes Ltd v Mulalley & Co Ltd[1]). 

On 23 December 2022, the decision in LDC (Portfolio One) Limited (LDC) v (1) George Downing Construction Limited (GDC); and (2) European Sheeting Limited (ESL) (in liquidation) was handed down by Veronique Buehrlen KC (the Judge) in the Technology and Construction Court with some common themes also seen in the Martlet case.

Background to the proceedings

  • In 2007 / 2008, three Manchester university halls of residence (exceeding 18m) were built.
  • GDC was the main contractor and ESL was the specialist cladding sub-contractor, each appointed on a design and build basis.
  • In September 2015, LDC, part of the Unite Students group of company, bought the freeholds, with the benefit of collateral warranties from GDC and ESL.
  • LDC brought proceedings against GDC and ESL in respect of:
    • defects in the external wall construction of the composite cladding elevations which caused water ingress and the deterioration of the structural insulated panels (SIPs), and
    • fire barrier and fire stopping defects which it claimed were not compliant with the Building Regulations in place at the time of construction.
  • Unfortunately, in or around May 2022, ESL went into creditor’s voluntary liquidation and ceased to participate in the proceedings.
  • In October 2022, LDC and GDC reached a full and final settlement of £17,650,000.
  • Whilst ESL’s liquidator stated that she did not object to judgment being entered against ESL, she did not consent to it and so LDC’s claim against ESL and GDC’s claim for contribution towards the settlement sum agreed with LDC went to trial.
  • At the trial:
    • LDC sought judgment against ESL in the sum of £21,152,198.87, for the cost of remedial works and loss of income; and
    • GDC:
      • claimed an indemnity and/or contribution against ESL for the settlement sum together with GDC’s reasonable costs of defending the claim brought against it by LDC, and
      • applied for ESL’s claim against GDC for a contribution and/or indemnity to be struck out.

They were successful in their claims.

As was the case with Martlet, the reasoning for the Court’s decisions was fairly fact dependent, including considering:

  • inconsistencies between the architectural specification, which required fire barriers, and ESL’s tender and minutes of pre selection meeting which stated no allowance had been made for any vertical fire barriers but noting that they were of the opinion that they were required; and
  • whether ESL was instructed to omit the ethylene propylene diene monomer (EPDM), the absence of which caused or contributed to the water ingress.

However, there were some common themes between the two cases. 

Was the sub-contractor subject to a strict obligation to comply with Building Regulations or to the reasonable skill and care duty?

This question arose in the Martlet case, finding that, where there are two competing standards, the more onerous will be applied, relying upon MT Højgaard A/S v E.On Climate and Renewables UK Robin Rigg East Ltd and another[2]

In this case, the Court made the same finding.  Notwithstanding the skill and care duty, the sub-contract obliged ESL not to put GDC in breach of its obligations under the main contract, with the clear commercial intention to make the sub-contract back-to-back with the main contract. To that end, ESL’s works were required to strictly comply with Building Regulations.

With both the water ingress and the fire safety defects being held to result from breaches of the Building Regulations, ESL was in breach.

In respect to the remedial works, had LDC failed to discharge its duty to mitigate its loss?

ESL pleaded that LDC had failed to mitigate its loss by failing to take steps to remedy the alleged defects in the period of November 2012 to September 2018, causing the SIPs to deteriorate further due to ongoing water ingress issues.

The Judge agreed with the decision in Martlet which said the Court would not be too critical of the choice of remedial works where that choice was made as a matter of urgency or on incomplete information.

The Court was critical of the fact that, by late 2016, LDC were not receiving the co-operation required from ESL to progress the remedial works and therefore had to turn to external consultants to do so. While LDC could perhaps have done more between late May 2017 and June 2018, ESL had not produced any evidence to suggest that any delays during that period impacted the scope of the remedial works.  It was held that ESL’s failure not to address the issues when they had the opportunity to do so was a significant cause of the deterioration of the SIPs.

ESL also played the enhancement card, arguing that the remedial works went beyond what was reasonably necessary.

Again, ESL’s argument failed.  The Judge set out the key legal principles in deciding whether a remedial scheme is reasonable, including:

  • the starting point for an analysis of what is reasonable is the costs incurred;
  • the extent the claimant relied on expert evidence in deciding to carry out the remedial works; and
  • the costs of any alternative remedial schemes.

Settlement Contribution Claim

And finally, ESL contested the reasonableness of the settlement between LDC and GDC.

Should GDC have settled?  Yes, GDC were right to settle.  The Judge stated that it was obvious, given her conclusions in respect of LDC’s claim against ESL, that LDC’s claim against GDC had substance and would most likely have succeeded. 

Was the settlement sum reasonable?  Yes. Citing Ramsay J’s decision in Siemens Building Technologies FE Limited v Supershield Ltd[3], the Judge dismissed ESL’s argument on the basis that:

  • there was strength in LDC’s claim,
  • the settlement was entered into as a result of legal advice,
  • the sum was supported by the joint quantum expert evidence, and
  • the settlement provided a discount of circa £4,000,000 in respect of LDC’s claim against ESL.

Takeaways

The trajectory of cladding claims looks to be becoming clear, as the Court in this case and in the Martlett case have taken a strict view on an external wall system’s compliance with Building Regulations in force at the time of construction.  Arguments to apply the lower standard of skill and care duty are likely to get short shrift. 

Those seeking to recover damages for the cost of remedying defects will be bolstered by the difficulties seen here in challenging the cost of remedial works carried out which resolve the defects.

Keep a close eye on those contract terms!

[1] [2022] EWHC 1813 (TCC)

[2] [2017] UKSC 59

[3] [2009] EWHC 927 (TCC) [80(5)-(6) (upheld by the Court of Appeal at [2010] EWCA Civ 7)

Our thinking

  • Business over Breakfast: Arbitration is cheaper – Myth or Reality?

    Thomas R. Snider

    Events

  • The UK’s March 2024 budget: Offshore trusts - have reports of their demise been greatly exaggerated?

    Sophie Dworetzsky

    Insights

  • Playing with FYR: planning opportunities offered by the UK’s proposed four-year regime for newcomers to the UK

    Catrin Harrison

    Insights

  • James Broadhurst writes for the Financial Times’ Your Questions column on inheriting company shares

    James Broadhurst

    In the Press

  • Cara Imbrailo and Ilona Bateson write for Fashion Capital on pop-up shops

    Cara Imbrailo

    In the Press

  • City AM quotes Charlotte Duly on the importance of business branding

    Charlotte Duly

    In the Press

  • Personnel Today quotes Rose Carey on Italy’s new digital nomad visa

    Rose Carey

    In the Press

  • Regime change: The beginning of the end of the remittance basis

    Dominic Lawrance

    Insights

  • Essential Intelligence – UAE Fraud, Asset Tracing & Recovery

    Sara Sheffield

    Insights

  • IFA Magazine quotes Julia Cox on the possibility of more tax cuts before the general election

    Julia Cox

    In the Press

  • ‘One plus one makes two': Court of Protection finds conflict of interest within law firm structure

    Katie Foulds

    Insights

  • City AM quotes Charlotte Duly on Tesco’s Clubcard rebrand after losing battle with Lidl

    Charlotte Duly

    In the Press

  • Michael Powner writes for Raconteur on AI and automating back-office roles

    Michael Powner

    In the Press

  • Arbitration: Getting value for your money

    Daniel McDonagh

    Insights

  • Portfolio Adviser quotes Richard Ellis on the FCA's first public findings against former fund manager Neil Woodford

    Richard Ellis

    In the Press

  • eprivateclient quotes Sally Ashford on considerations around power of attorney

    Sally Ashford

    In the Press

  • Michael Powner and Sophie Rothwell write for Law360 on anti-bias protection

    Michael Powner

    In the Press

  • Providing pro bono support on social housing issues

    Susan Field

    Insights

  • Charles Russell Speechlys Partner Promotions 2024

    Bart Peerless

    News

  • Has a new route to recovery opened up for victims of banking payment frauds?

    Katie Bewick

    Insights

Back to top