Building your dream home? Avoid these traps for the unwary

min read

Like many couples who have been scarred by poor build quality on new-build homes, Mr and Mrs Griffiths were keenly aware of some of the challenges that building your own home can bring. Unfortunately, this did not stop them from sadly finding themselves in a dispute with their builder.

Unfortunate Beginnings

The Griffiths, attracted by C E Gilbert (Building Contractors) Limited’s (CEG) A1 status with the National House Building Council (NHBC), contracted with them to build a new home. The contract price was nearly £2 million.

As part of CEG’s obligations, they were to obtain new building insurance for defective works from the NHBC. CEG did so and Mr Griffiths signed a document accepting £1 million worth of cover.

Notwithstanding CEG’s A1 status, defects were found, along with asbestos contamination of the surrounding land, and the Griffiths successfully arbitrated against CEG. As would be usual for many small-time contractors, CEG couldn’t pay and they, therefore, went insolvent. On the bright side, the Griffiths managed to get the NHBC to pay out £1 million plus indexation under their insurance.

With a shortfall and CEG bust, the Griffiths resumed their proceedings against Mr Gilbert (the claim having been paused for the arbitration proceedings against CEG to play out), who was the director and shareholder of CEG: Griffiths & Griffiths v Gilbert [2022] EWHC 3122 (TCC).

The Claim (and result)

Mr Gilbert, the Griffiths say, had fraudulently misrepresented that CEG would take out NHBC cover to the full build costs of £2 million. Further, the Griffiths claimed, if the NHBC cover had been for £2 million, they would have obtained more from their settlement with the NHBC.

Facing a claim of fraudulent misrepresentation worth c.£1 million against himself in a personal capacity, Mr Gilbert denied these allegations. His defence was simple: he had told the Griffiths that CEG would obtain the NHBC’s standard insurance coverage of £1 million and had not represented that CEG would obtain NHBC cover for £2 million.

With the battlelines drawn, and the dispute now in the High Court, the judge examined the instances where the alleged misrepresentations happened.

What he concluded disappointed the Griffiths:

  • Was there a representation in a pre-contract meeting? No. Perhaps surprisingly, the judge was persuaded by a note made by Mr Gilbert’s son of a pre-contract meeting. This note was transcribed from a smaller notebook into a larger notebook some 6 to 8 months after the meeting while adding some additional recollections. The small notebook had no mention of any NHBC value discussion, while the larger notebook contained the following: “NHBC – agreed same cover as Braggington + £1M as a comparable (maximum cover).”
  • From Mr Griffiths’ enquiries with the NHBC, it would cost £5,838 for £2 million cover for the property. Could the inclusion of the figure of £7,000, later increased to £10,500, detailed against an “NHBC” line item in the draft costings, be a representation Mr Gilbert had obtained a quotation from the NHBC for a premium to cover the full build costs (rather than for £1 million) and that CEG would take out such cover? Again, no – those figures could not be a representation for insurance cover for specific amounts. The Griffiths’ argument unravelled when the timeline of their discussions with the NHBC was examined.
  • Even if those figures were in valuations issued under the building contract? Even then, no.
  • Was it plausible that Mr Griffiths had failed to spot the reference to £1 million cover, simply signing and filing the NHBC certificate of cover on receipt? No – the judge did not accept this and was unimpressed by the attempt to explain away Mr Griffiths’ lack of alarm.

This put a decisive end to the Griffiths’ claim.

Takeaways

Whilst the result must have left the Griffiths extremely unhappy, lessons can be learnt for those considering venturing out to build their dream home:

  • probe the particulars of NHBC cover, including whether the level of cover is appropriate;
  • obtain transparency over costings (to the extent possible), including examining supporting quotations;
  • ensure key terms are written into the building contract – this protects all parties to the transaction – avoiding those dispute-prone grey areas;
  • check any warranty documentation upon receipt; and
  • avoid relying on a contractor’s or consultant’s solvency to pay out any damages due to defects, especially where the project value runs into the millions. Plan for the worst-case scenarios.

The tragedy of it all was that a simple sentence in the building contract explaining what NHBC insurance was required would have made the dispute redundant - although this advice won’t be of much use to the Griffiths now.

Our thinking

  • IBA Annual Conference 2026

    Jean-Baptiste Beauvoir-Planson

    Events

  • Andrew Ross contributes to a legal Q&A in Estates Gazette on nuisance claims

    Andrew Ross

    In the Press

    min read
  • Farmers Weekly quotes Sadie Pitman on planning system reforms

    Sadie Pitman

    In the Press

    min read
  • Tamasin Perkins writes in IFA Magazine about the limits of “challenge-proof” wills

    Tamasin Perkins

    In the Press

    min read
  • Caroline Greenwell comments in Global Investigations Review on Jonathan Fisher KC's report, Fraud in the Digital Age, and its recommendations for tackling fraud in the UK

    Caroline Greenwell

    In the Press

    min read
  • Charles Russell Speechlys advises Myriad Group, owners of Caring Homes, on its acquisition of Parklands Care Homes, a Scottish care home provider

    Martin Wright

    News

    min read
  • Can I move abroad with my child after separation?

    Hannah Owen

    Quick Reads

    min read
  • Charles Russell Speechlys’ Landed Estates, Heritage & Agriculture team report from the 167th Great Yorkshire Show

    Katie Talbot

    Quick Reads

    min read
  • Adverse Possession and Leasehold Land

    Helena Cullwick

    Insights

    min read
  • Swiss executors dealing with UK assets – what do I do? Part two

    Sophie Hart

    Quick Reads

    min read
  • Costs, Conduct & Counter-Offers – Key Takeaways from the Bankside rights of light costs decision

    Georgina Muskett

    Insights

    min read
  • Update: Objectivity in section 172 Companies Act 2006: Re-examining the Current Position after Saxon Woods Investments Ltd v Costa

    Andrew Collins

    Insights

    min read
  • 9fin quotes Jamie Rhodes and Tom Smitham on the growing role of private capital in football finance

    Jamie Rhodes

    In the Press

    min read
  • The National Security and Investment Act, Five Years On: What the 2025-26 Annual Report Tells Foreign Buyers

    Greg Stonefield

    Insights

    min read
  • Jersey Trade Mark Reform: What the New Regime Means for You

    Dewdney William Drew

    Quick Reads

    min read
  • The Telegraph quotes Julia Cox on the growing use of Family Investment Companies for inheritance planning

    Julia Cox

    In the Press

    min read
  • Tessa Bartley comments in Legal Futures about our framework for choosing the right legal AI tools

    Tessa Bartley

    In the Press

    min read
  • Investors’ Chronicle quotes Katie Talbot on the risks and responsibilities of undertaking a trustee position

    Katie Talbot

    In the Press

    min read
  • Chiara Muston comments in Employee Benefits on minimum wage enforcement changes

    Chiara Muston

    In the Press

    min read
  • Retail Collection: Reputation management for brand founders

    Claudine Morgan

    Podcasts

Back to top