Accelerating Safety: The Building Safety (Remediation of Unsafe Cladding etc) Bill
min readBackground
As at the end of August 2026, the government had identified 4,724 residential buildings which are 11 metres and over with unsafe cladding; 46% of which had not started remediation works for a variety of reasons.
Over the last two years, the government has focused its efforts on addressing this issue.
In 2024, it published a Remediation Acceleration Plan (updated in 2025) and, as part of that legislative commitment, has now introduced the Building Safety (Remediation of Unsafe Cladding etc.) Bill. The terms of the Bill may be subject to change as the Bill progresses through Parliament.
Key takeaways
The Bill moves the focus of the regime away from arguments over who should pay, towards getting unsafe buildings fixed.
- For building owners, landlords and other parties with repair obligations such as Right to Manage Companies, the message is that inaction will no longer be a viable option, with fixed deadlines, penalties, and the prospect of public authorities stepping in to carry out works.
- For developers and contractors who have funded remediation, the radical changes proposed by the Bill to section 149 of the Building Safety Act 2022 (“BSA”) (manufacturers’ liability for past defaults relating to cladding products) and the proposed extension of the ability to pursue group companies through building liability orders offer a substantially stronger route to recover those costs against manufacturers and their wider groups.
- A new offence will apply to anyone who unreasonably obstructs a person lawfully assessing or remediating a building, and various further financial penalties would be introduced.
Key changes introduced by the Bill
The Bill introduces the following key changes for occupied buildings:
Responsible Entity: those who have become familiar with the BSA and the associated legislation in the building and fire safety arena, will have had to get to grips with the terms “Principal Accountable Person”, “Accountable Person” and “Responsible Person” but the Bill creates a new designation, that of the “Responsible Entity”. The primary focus of the Bill being to external wall issues for in-scope buildings, the “Responsible Entity” in relation to all or part of the external walls for such a building is the person or entity required under a lease or by virtue of legislation to repair or maintain those walls (or part thereof).
Mandatory registration of medium-rise buildings: the Bill brings into scope registration of medium-rise buildings, being multi-occupied residential buildings in England containing at least two dwellings that are over 11 metres tall or have at least five storeys. The “registration duty-holder” for these buildings will be required to ensure that they are registered and remain within the legislative framework whilst occupied (as well as having to comply with certain other duties).
The “registration duty-holder” is another new term that the Bill would seek to bring about and it, in essence, brings across the accountable person definition from the BSA and applies it to in-scope buildings within the Bill as if they were Higher Risk Buildings (with provisions for allowing multiple accountable person-equivalents to agree who will be the registration duty-holder and for a determination process via the FTT).
Mandatory assessments and remediation plans: all in-scope buildings (which for this purpose also include unoccupied “relevant buildings” but are restricted to those completed before 28 June 2022) will be required (save in respect of certain very limited exceptions) to have a compliant fire risk assessment of their external walls (commonly referred to as a FRAEW) carried out by a suitable professional within a window from 16 May 2022 and ending 12 months after Royal Assent of the Bill.
Where the written report prepared as part of the assessment recommends remediation works or interim mitigation measures, Homes England will be required to audit it (as well as having the right to audit a proportion that do not recommend works).
The responsible entities for such in-scope buildings and where remediation works are required must prepare and publish a remediation compliance plan (within certain deadlines, the first of which will likely be within 15 months of Royal Assent) explaining (amongst other things) the proposed steps and the timetable to implement the recommendations and sharing it with residents and leaseholders (amongst others and amongst other required means of dissemination).
Failure to carry out the FRAEW recommendations, without reasonable excuse, has serious sanctions including prosecution and up to 2 years’ imprisonment or a financial penalty of up to £500,000. These duties will come into force 2 months after Royal Assent. Liability for fines may also be extended to group undertakings e.g. parent companies.
There are also a range of other financial penalties that are potentially applicable depending on the circumstances, some of which are very significant.
Remediation Backstop: local authorities and Homes England will have the power to carry out remediation works where the responsible entity is unable or unwilling to do so, and to recover the costs through a remediation management order obtained from the FTT. But this does not mean that the responsible entity can safely leave remediation works to Homes England. The regulator (amongst other set enforcement authorities) can still prosecute the responsible entity for failure to comply with their duty to remediate.
Claims against cladding manufacturers to be altered: the Bill substantially amends section 149 (liability for past defaults relating to cladding products) of the BSA, making it easier for developers and others who have paid (or will be paying) to remediate unsafe buildings to recover those costs from the manufacturers responsible for the cladding products, sharing the responsibility for remediation on a wider scale.
The Bill does this in the following ways:
- Liability will depend on whether the cladding product is inherently unsafe or there was misleading conduct, rather than on technical compliance arguments about whether a product was 'defective'.
- Causation will be met if the cladding product made "more than a trivial contribution" to the building, or the dwelling within it, being unfit for habitation. Where misleading conduct made the selected use of the product more likely, causation is presumed unless the manufacturer can prove otherwise.
- Developers and others who have funded (or are liable to fund) remediation will be able to bring claims against manufacturers directly. Section 149 currently requires a claimant to hold a relevant interest in the building in order to bring a claim.
Strengthen the ability to bring claims against manufacturers:
- The court will have a new power to order anyone holding relevant material to disclose it where there is a "serious possibility" of a section 149 claim. This includes material that will help identify the correct defendant.
- More crucially, the Bill gives the courts the power to make building liability orders (BLOs) against associates of the relevant cladding manufacturer in section 149 claims. In practice, claimants will therefore not be limited to pursuing the trading entity that supplied the product, which may have since ceased trading or been wound down. Liability can be extended to the manufacturer's wider corporate group. This does raise the critical issue of whether BLOs made against overseas group companies will be enforced by the relevant foreign court.
The disclosure power and the BLO regime work in tandem for potential claimants: the former helps identify who within the wider group was involved, and latter allows liability to flow through the group's structure.
Next steps
More detail on many of the provisions in the Bill will follow in secondary legislation. The government expects to make secondary legislation within a year of Royal Assent. In the meantime, owners, landlords and RTM Companies should identify buildings which may fall within scope and prepare for the assessment now. Those with potential claims against manufacturers should review their position, including any cases already under way to understand how the Bill may impact them.
Contact us
This Insight is a summary of key parts of the Bill as introduced to Parliament. There are other aspects the Bill would introduce that are not covered here. If you have any queries, please contact Sylwia Barchus, Chris Marks or your usual Charles Russell Speechlys contact.