‘Black holes’ on construction projects – The gravity of the situation

The TCC’s recent decision in Dr Jones Yeovil Limited v The Stepping Stone Group Limited is a useful reminder of the issues posed by legal “black holes”.

What is a “black hole” in contract law?

It is a fundamental principle of English law that damages for a breach of contract are to put the innocent party in the position that it would have been in had the other party complied with its obligations under the contract.  Damages should compensate for loss incurred.  So, if there is no loss, then the claimant should only receive nominal damages even if the defendant is in breach of their contractual obligations.

In construction projects, the no loss argument can lead to a contractual “black hole”, even if the defendant’s actions have caused the claimant to suffer serious losses.

One way a black holes may arise is where the developer is a separate legal entity to the owner of the land. In this case it may be argued that the developer (the entity with a contractual claim against the contractor/consultant responsible for the defect) has not suffered a loss, as it doesn’t own the works in question and isn’t under any obligations to repair. This risk can be mitigated by the developer entering into a development agreement which provides obligations to the owner of the land so that the loss incurred by the owner can then be passed to the developer. However, the developer may seek to restrict its liability period under such an agreement to only a limited period following practical completion.  Another way to avoid such a black hole is to require all the relevant contractors and consultants to enter into collateral warranties with the owner of the land so that it can claim against the relevant contractor and/or consultant directly.

Transferred loss

In order to avoid such situations where a ‘black hole’ may arise, the courts have developed a number of principles, including the principle of “transferred loss”. Transferred loss is a complicated area of evolving case law, but essentially it can be divided into a “narrow” and “broad” ground. The narrow ground enables an employer to claim on behalf of a third party purchaser where the purchases are foreseeable at the time of entering into the building contract. The broad ground applies where, at the time of entering into the contract, the parties have a common intention and/or a known objective to confer a benefit to an independent third party.  

Dr Jones Yeovil Limited (DRJ) v The Stepping Stone Group Limited (Stepping Stone) - Background

DRJ was employed by Stepping Stone to carry out works on a number of assisted living units. The property on which the assisted living units were constructed was owned by NCL, a subsidiary of Stepping Stone and a separate legal entity. After practical completion NCL sold the properties on long leases and retained the freehold of the common parts.

A dispute regarding defective work arose after practical completion. The building contract specified the use of ground source heat pumps.  DRJ had not complied with this specification and instead installed less efficient heat pumps. Stepping Stone claimed against DRJ for the increased energy costs incurred by the leaseholders of the units as a direct result of the less efficient heat pumps.

The court’s decision

DRJ contended that Stepping Stone had in fact suffered no loss, as it was neither the occupier nor owner of the assisted living units. Stepping Stone initially suggested that it had entered into a development agreement with NCL, which contained an obligation to indemnify for defective work. This argument was dismissed as there was no documentary evidence that this development agreement actually existed. Stepping Stone therefore attempted to rely on the broad ground of the transferred loss principle, arguing that at the time the building contracts were entered into, Stepping Stone and DRJ had intended to transfer the benefits under those contracts to both NCL and the purchasers of the assisted living units.

However, the court rejected Stepping Stone’s argument. The court noted that the broad ground of the transferred loss principle was good law, underpinned by the need to provide a remedy for a breach of contract in the interests of giving effect to the object of that contract. However, the court reasoned that, as the building contract contained a clause expressly dis-applying the effect of the Contracts (Rights of Third Parties) Act 1999 (pursuant to which contractual rights may be conferred on identifiable third parties), there was a positive disclaimer of the known third party benefit. Therefore, the broad ground of the transferred loss principle could not apply.

Going forward

As ‘boilerplate’ clauses dis-applying the effect of the Contracts (Rights of Third Parties) Act 1999 are ubiquitous in UK construction contracts (and for good reason), the broad ground of the transferred loss principle is unlikely to assist parties in the future who find themselves in Stepping Stone’s position.

The court’s decision in this case demonstrates the importance of collateral warranties and third party rights agreements in construction projects where the loss may fall on a party with no contract with the defendant. Had NCL or the residents had the benefit of collateral warranties or third party rights from DRJ, they would have been able to recover their losses directly, rather than passing them on to Stepping Stone to pursue. As such, while the preparation, negotiation and execution of collateral warranties and third party rights agreements might seem a laborious exercise during a project, their worth should not be overlooked.

This article was written by Sam Johnson. Please do not hesitate to contact Sam, or your usual Charles Russell Speechlys contact if you have any queries. 

Our thinking

  • In-House Insights: Legal operations at work - how to do more with less

    Megan Paul

    Events

  • Syma Spanjers and Francesca Heath-Clarke write for People Management on tackling discrimination against young female workers

    Syma Spanjers

    In the Press

  • HR magazine quotes Isobel Goodman on second jobs and HR obligations

    Isobel Goodman

    In the Press

  • Cy-près engaged to revive the “spirit” of the long-forgotten “English Method”

    Jennifer Doggett

    Insights

  • Property Week quotes Lauren Fraser on the Supreme Court case of A1 Properties v Tudor Studios RTM

    In the Press

  • UK Government AI Regulation Response & Roadmap – Is the Government behind the wheel?

    Mark Bailey

    Insights

  • Noni Garratt-Wall takes part in interviews on our Firm's rebrand and marketing strategy

    In the Press

  • The Daily Telegraph quotes Nick Hurley on the surge of unexplained absences in the workplace

    Nick Hurley

    In the Press

  • Remote Hearings – factors to consider

    Richard Kiddell

    Insights

  • IR35 update: HMRC consultation on proposed mechanism for off-setting tax liabilities

    Hugh Gunson

    Insights

  • Richard Davies writes for City AM on the lessons that the Premier League can learn from the Super Bowl and NFL

    Richard Davies

    In the Press

  • “Lead Linings Playbook” – A relationship and divorce involving Narcissistic Personality Disorder

    Charlotte Posnansky

    Insights

  • The Evening Standard quotes Kelvin Tanner on the rush to complete Skilled Worker visa applications

    Kelvin Tanner

    In the Press

  • Sophie Rothwell writes for Law 360 on the Bullying and Respect at Work Bill

    Sophie Rothwell

    In the Press

  • Property Week quotes Samuel Lear on the Renter’s Reform Bill

    Samuel Lear

    In the Press

  • Charles Russell Speechlys advises Entrepreneurial Food Group on the sale of two food production businesses to The Compleat Food Group

    Hamish Perry

    News

  • The Global Legal Post quotes Mike Barrington on Tesco’s decision to sell its banking practice

    Mike Barrington

    In the Press

  • David Savage writes for Property Week on the case of Triathlon Homes vs Stratford Village Development Partnership and Get Living

    David Savage

    In the Press

  • Community Infrastructure Levy and common pitfalls

    Sadie Pitman

    Insights

  • UK tax considerations for US persons relocating to the UK

    Matthew Radcliffe

    Insights

Back to top